Baggi Power Plant
Baggi During the construction of Beas Satluj Link Project, it was observed that a power plant could be constructed at the exit of Pandoh - Baggi Tunnel (PBT) as sufficient head was available between Pandoh Reservoir and at the start of Sunder Nagar Hydel Channel (SNHC). Consequently, a by-pass tunnel upstream of Baggi Control Works (BCW) was constructed to divert the water for the prospective power plant.
A 6.1 diameter by pass tunnel is taken off from PBT at 170.3 m upstream of BCW at Baggi providing a Discharge of 170 cumecs for the proposed 2 x 20 MW Baggi Power House.
BBMB has revived the Baggi Power project.

Baggi Power Plant
Types of Power Houses Run Of the River
Water Conductor System Hydel Tunnel and Channel
Number Of Units 2
Installed Capacity 2 x 20 MW
Type of Turbine Vertical, Francis
Speed of Turbine 166.7 rpm
::Back to Top::

Home ISO Documentation Cigre Papers Press Releases Press Clippings Public Notices Citizen Charter Photo Gallery BBMB Magazine